South Asia Semiconductor limited SAS

South Asia Semiconductor limited SAS
SAS

Sunday, 1 December 2024

Cleanroom Construction Bid for South Asia Semiconductor (SAS)

Cleanroom Construction Bid for South Asia Semiconductor (SAS)

To: Cleanroom Construction and Consulting Firms

From: Toor Khan, Founder & CEO, South Asia 

Subject: Cleanroom Construction Bid for 50,000 sq ft Facility at Islamabad Technology Zone (ITZ)

Introduction

South Asia Semiconductor (SAS), a leading startup in Islamabad Technology Zone (ITZ), is seeking bids from qualified cleanroom construction and consulting firms for the construction of a new 50,000 sq ft cleanroom facility. This facility will be dedicated to the production of advanced 7nm System-on-Chip (SoC) devices.

Project Scope

The project scope includes the following:

  • Design and construction of a Class 100 (ISO 5) cleanroom environment across 50,000 sq ft.
  • Integration of essential cleanroom utilities, including High-Purity Water (HPW) system, Ultra-Filtered (UF) Compressed Dry Air (CDA) system, and exhaust systems.
  • Installation of specialized cleanroom furniture and fixtures.
  • HEPA filtration systems and air handling units for maintaining air quality.
  • Integration of temperature and humidity control systems.
  • Lighting systems designed specifically for cleanroom environments.
  • Validation and qualification of the cleanroom in accordance with ISO 14644 standards.
  • Project management and construction oversight.
  • (Optional) Consulting services for cleanroom operations and best practices.

Bid Requirements

We require detailed proposals from qualified firms that include the following information:

  • Company profile and experience in cleanroom construction, specifically for semiconductor production.
  • Past projects with comparable scale and complexity.
  • References from previous clients.
  • Proposed timeline for the project completion.
  • Detailed breakdown of costs, including materials, labor, and engineering fees.
  • Qualifications and experience of the project team.
  • Safety record and approach to cleanroom construction.
  • Warranty information for installed equipment and construction work.

(Optional)

  • Expertise in cleanroom operations and best practices (if consulting services are offered)

Selection Criteria

SAS will evaluate all bids based on the following criteria:

  • Experience and qualifications of the firm.
  • Track record in cleanroom construction for semiconductor applications.
  • Proposed project timeline and budget.
  • Quality of proposed design and materials.
  • Safety record and commitment to quality.
  • (Optional) Expertise in cleanroom operations (if consulting services are offered)

Submission Process

Please submit your proposals electronically to toorkhan@sasemicon.com by [Date].

Hashtags

#CleanroomConstruction #SemiconductorCleanroom #CleanroomPakistan #ITZ #ISO14644 #7nmSOC #SASemiconductor

Thank you for your interest in this project. We look forward to receiving your proposals.

Sincerely,

Toor Khan

Founder & CEO

South Asia Semiconductor (SAS)

No comments:

Post a Comment